Well-designed 2QV-AF Froth Pump to Madras Factory

Well-designed
  2QV-AF Froth Pump  to Madras Factory

Short Description:

Product Features AF series froth pumps are our company newly designed & developed products based on the advanced technology from home and abroad. Being popularized and promoted; now they are widely used in metallurgical industry, mining sector, coal ore and chemical engineering to handle abrasive and corrosive slurries with foam and froth. When operated, AF pumps can effectively eliminate foam and froth in slurry and will also function properly even with inadequate feeding slurry, thus ma...


Product Detail

Product Tags

Related Video

Feedback (2)

With this motto in mind, we've got develop into amongst one of the most technologically innovative, cost-efficient, and price-competitive manufacturers for , , , To learn more about what we can easily do in your case, make contact with us at any time. We glance forward to developing superior and long-term organization interactions along with you.
Well-designed 2QV-AF Froth Pump to Madras Factory Detail:

Product Features

AF series froth pumps are our company newly designed & developed products based on the advanced technology from home and abroad. Being popularized and promoted; now they are widely used in metallurgical industry, mining sector, coal ore and chemical engineering to handle abrasive and corrosive slurries with foam and froth. When operated, AF pumps can effectively eliminate foam and froth in slurry and will also function properly even with inadequate feeding slurry, thus making them the ideal choice for delivering foam slurries, esp. in flotation process.

Structure Features

  • Bearing assembly of AF series is the same with that of SP, SPR series. Bearing housing is installed with motor frame base or supporting plate, i.e. pump and motor are connected either directly with coupling or through pulley and belts. Pulleys can be exchanged conveniently to adjust the pump rotating speed to satisfy the varying operating conditions.
  • Feeding tank can be steel , stainless steel or coated with rubber with overflow box and tangential inlet. The former can transmit the excessive incoming slurry back to its pit, while the latter will allow the slurry quickly get into the pump body and make part of the foams disappear.
  • Double casings structure the pump head. Wetted parts are metal lined, rubber lined or of other non-metallic material according to the different slurries.

Construction Drawing

21_副本

      1. Frame Plate                               6. Frame Plate Liner Insert

      2. Cover Plate                                 7. Tank

      3.Cover Plate Liner Insert                 8. Shaft

      4.Volute Liner                                 9.  Bearing Housing

      5.Frame Plate Liner Insert

Technical Parameter

 Pump            Model           

 Capacity (m3/h)   

 Head (m)       

 Speed (r/min)   

Eff. (%)  

      Diameter

 

 Inlet (mm)  

Outlet  (mm)   

 

 2QV-AF

7.6-42.8

6-29.5

800-1800

45

100

50

3QV-AF

23-77.4

5-28

700-1500

55

150

75

4RV-AF

33-187.2

5-28

500-1050

55

150

100

6SV-AF

80-393

5-25

250-680

55

200

150

8SV-AF

126-575

5.8-25.5

350-650

55

250

200

Selection Chart

22_副本


Product detail pictures:

Well-designed
  2QV-AF Froth Pump  to Madras Factory detail pictures


Every single member from our higher effectiveness product sales staff values customers' requires and organization communication for Well-designed 2QV-AF Froth Pump to Madras Factory, The product will supply to all over the world, such as: Brunei , Hyderabad , Grenada , With the goal of "zero defect". To care for the environment, and social returns, care employee social responsibility as own duty. We welcome friends from all over the world to visit and guide us so that we can achieve the win-win goal together.


  • Breaking drill pipe connection while the mud pump is on.

    Breaking drill pipe connection while the mud pump is on. Under pressure drilling is a procedure undertaken when a branch connection is required off a live pipe .

    ROD ADDITION.

    This cell phone video shows a workover rig blowing out tubing out of the hole. It is a little rough as the Man with the phone keeps running, then stops and records .

    Drilling Simulation performed on July 2013 at São Roque do Paraguaçu (Bahia – Brasil)

    Good quality and fast delivery, it's very nice. Some products have a little bit problem, but the supplier replaced timely, overall, we are satisfied.


















    5 Stars By Chris 2015-12-23 18:26
    The accounts manager made a detailed introduction about the product, so that we have a comprehensive understanding of the product, and ultimately we decided to cooperate.

    5 Stars By Barbara 2016-10-17 12:04